Spot Renewal Timber Sleepers - Bukit Mertajam to Padang Besar
Direct KTMB Contract.
Contract Period : 15th May 2001 – 28th October 2001
Pre-assemble of Turnouts and Transporting of Turnouts from Storage Site Slim
River to Pre-assembly Site Sungkai to Ipoh.
Sub-Contract : Main Contractor ‘Malnaga Sdn. Bhd.’
Contract Period : 27th Dec 2001 – 05th Oct 2003
Electrified Double Track Project between Rawang to Ipoh
“Provision of Track Repairs Teams”
Sub-Contract : Main Contractor ‘Emrail Sdn. Bhd.’
Start Date : 15th April 2002 – 31st July 2006
Electrified Double Track Project between Rawang to Ipoh – Bridge Construction
“Provision of Track Monitoring Teams”
Sub-Contract : Main Contractor ‘United Engineers (M) Construction Sdn. Bhd.’
Start Date : 17th May 2002 – 31st July 2006
The Strengthening, Rehabilitation and Painting of Steel Bridges and Track Works Between Gemas and Kuala Lipis Station.’
Contract Period : 17th Jun 2003 – 16th Jun 2004.
Sub-Contract : Main Contractor ‘Syarikat Kamashari Sdn. Bhd’
Design and Build for Proposed Bridge Over KTM Track for Access Road Lot No. 582, 661 and 1921, Taman Seri Mewah, Mukim Buloh Kasap, Daerah Segamat, Johor Darul Takzim.
Start Date : 30th Sept 2004 – 02nd Jul 2005
Developer : POKTA Sdn. Bhd.
Consulant : KL Consult and Associate Sdn. Bhd.
Design, Construction and Commissioning of New Railway Halt at KM 375.800 Between Sg. Buloh and Kepong Station (Kepong Sentral) ~ “Sub-Contract for the Canopy Erection And Track Works”
Sub-Contract : Main Contractor “Loh & Loh Construction Sdn Bhd”
Start Date : 21st Jun 2005 – 05th Oct 2005
Proposed Strengthening And Replacement of Railway Bridge Superstructures And Associated Works Between Rembau And Tampin Station
Sub-Contract : Main Contractor “Syarikat Kamashari Sdn Bhd”
Start Date : 21st Feb 2006 – 21st August 2007
Track Strengthening Work (Sleepers Changing) – 8,000 Units Between Railway Station Tampin – Gemas (Km530.00 – Km562.00)
Contract Period : September 2006 – November 2006
Direct KTMB Contract.
Emergency Remedial Works And Protection Works To Bridge No. 1544 at Km 605.28, at Tenang Damaged by Floods
Contract Period : Emergency Works in January 2007
Direct KTMB Contract
Rehabilitation And Strengthening of Track And Associated Works Between Rembau And Tampin Station
Sub-Contract : Main Contractor “Hisniaga Jaya Sdn Bhd”
Start Date : 01st July 2006 – December 2007
Proposed Remedial And Strengthening Works on Bridges Riverbank Protection And Associated Works Near Bangi Railway Station And Other Locations
Sub-Contract : Main Contractor “HIS Resource Sdn Bhd”
Start Date : 29th May 2007 – 28th May 2008
Electrified Double Tracking Project Between Ipoh And Padang Besar
“Construction of New and Dismantling of All the Public Level Crossing and Construction of Construction Level Crossing and Other Related Works”
Sub-Contract : Main Contractor “MMC Gamuda Joint Venture”
Start Date : 10th January 2008 to 03rd October 2014
Electrified Double Tracking Project Between Ipoh And Padang Besar
“Anti-Rust Protection Treatment of UIC54 Rails at Taiping Yard”
Sub-Contract : Main Contractor “MMC Gamuda Joint Venture”
Start Date : 01st February 2009 to 30th September 2009
Electrified Double Tracking Project Between Ipoh And Padang Besar
“Track Dismantling and Recovery of Track Materials and Others Related Track Works”.
Sub-Sub Contract : Sub-Contractor “Emrail Sdn Bhd”
Start Date : 01st February 2012 to 30th June 2013
Electrified Double Tracking Project Between Ipoh And Padang Besar
“De-stressing of Tracks” and “AT Welding UIC54 Rails, Guard Rails Installation at Viaduct Sections”
Sub-Sub Contract : Sub-Contractor “Emrail Sdn Bhd”
Start Date : 01st December 2012 to 30th June 2013
Electrified Double Tracking Project Between Ipoh And Padang Besar
“The Construction, Completion, Testing, Commissioning And Maintenance of Infrastructure Works Train SET/EMU Maintenance Depot, Locomotive - Coaches Maintenance Depot and Wagon Repair Shed at Bukit Tengah (S16) (N5) – Installation of Railway Track Works and Public Level Crossings”
Sub-Sub Contract : Sub-Contractor “Gabungan Strategik Sdn Bhd”
Start Date : August 2012 to 31st August 2013
Rehabilitation and Remodeling of the Existing Multimodal Freight (MMF2) Yard for KTMB.
“Construction of Hardstand, Track Remodeling Works and Other Related Works”
Direct KTMB Contract.
Start Date : 01st March 2013 to 28th April 2013
Electrified Double Tracking Project Between Ipoh And Padang Besar
“The Design, Construction, Manufacture, Supply, Delivery, Installation, Testing, Commissioning and Maintenance of the Swing Bridge and its Associated Work. Subcontract for Double Track and Guard Rails Installation Works on New Prai Swing Bridge”
Sub-Sub Contract : Sub-Contractor “Ikhmas Jaya Sdn Bhd”
Start Date : 01st April 2013 to 30th May 2014
Electrified Double Tracking Project Between Ipoh And Padang Besar
“Permanent Way Depot/OHLE/SCD, Centre Office, Administration Building, Control & Control Property Department At Bukit Mertajam (N5 / S17) – Railway Track”
Sub-Sub Contract : Sub-Contractor “SP Mega Sdn Bhd”
Start Date : 01st August 2012 to 28th September 2012
Electrified Double Tracking Project Between Ipoh And Padang Besar
“Transfer of KTMB’s Recovered Materials from Tanjung Rambutan / Taiping Yard to Mentakab Station Yard, Jalan Kastam / Pulau Indah & Tanjung Pelepas”
Sub-Contract : Main Contractor “MMC Gamuda Joint Venture”
Start Date : 01st July 2013 to 31st December 2013